Custody Transfer Meter Runs

Custody Transfer Meter Runs

A complete measurement spool built and documented as one item: upstream straight length, flow conditioning, the primary element, downstream length and matched flanged ends. The straight run is machined and verified in the shop rather than assumed on site, which is where most installed uncertainty is lost.

Size rangeNPS 2″ – 44″
Pressure classClass 150 – 2500
Design codesAGA-3 · ISO 5167
Bore finishMeasured and recorded
Request a quote PDF Download datasheet
Range

The primary element is a choice inside the run

All three runs are built the same way. What changes is how the plate is held — and that decides whether a plate change needs a shutdown, a local outage, or nothing at all.

Custody transfer orifice plate meter run

Orifice Plate Meter Run

Plate between orifice flanges

Plate mounted between orifice flanges with inlet and outlet spools welded either side. No moving parts in the run. A plate change means shutting down and breaking the flange.

Meter run with single chamber fitting

Single Chamber Fitting Run

Local outage to change a plate

Single chamber fitting welded into a complete run with conditioning and matched pipe sections. The plate comes out through the top once the line section is isolated and depressurised and the clamp bar is removed.

Meter run with dual chamber orifice fitting and Laws flow conditioner, 8 in Class 600 RTJ, with three 1½ in flanged branch connections

Dual Chamber Fitting Run

Plate change under pressure

Dual chamber fitting welded into the run, keeping plate access live. The line stays in service at full pressure while the plate is withdrawn through the upper chamber.

Layout

Where the straight lengths are measured

Upstream and downstream lengths meet at the orifice plate. The conditioner divides the upstream length into UL1 and UL2; the downstream length DL runs to the thermowell. The values follow from the beta ratio and are stated on the calculation sheet for the duty.

UL1Inlet face to conditioner outlet (UL − UL2)
UL2Conditioner outlet to orifice plate
ULUpstream meter tube length, inlet face to orifice plate
DLDownstream length, orifice plate to thermowell
LOverall length, face to face
Meter run layout: inlet flange, flow conditioner, dual chamber orifice fitting, thermowell boss and outlet flange, with the straight lengths UL1, UL2, UL, DL and the overall length L
Specification

Technical data

Size range Orifice plate meter run NPS 2″ – 44″ (DN 50 – DN 1100); dual and single chamber fitting runs NPS 2″ – 24″ (DN 50 – DN 600), higher sizes on request
Pressure class ASME Class 150 – 600 standard; up to Class 2500 special production to NPS 12″; fitting runs NPS 14″ – 24″ up to Class 1500
Design codes AGA Report No. 3, ISO 5167-1 and -2
Straight lengths Per AGA-3 / ISO 5167-2, or shortened with a conditioner
Flow conditioning Zanker, NEL (Spearman), Laws, tube bundle
Tube bore tolerance Machined and recorded; four diameters measured in each cross-section
End connections Flanged to ASME B16.5 / B16.47 with RF, RTJ or groove type facing; butt weld ends to ASME B16.25; special end connections on request
Measuring uncertainty Set by the element in the run and by compliance with the straight-run and bore requirements; stated on the calculation sheet for the duty
Internal surface finish Bore honed or machined to the roughness the standard requires for the line size and beta ratio in use, inside both its upper and lower limits
Marking Tag number, job number, measured bore, flow direction and spool identification on each section
Quality control ISO 9001 system; PED where it applies; qualified welding procedures, NDE and a hydrostatic test (pneumatic where the project specifies) to the project specification
Documentation Sizing calculation, bore measurement report, material certificates (EN 10204 3.1/3.2), welding and NDE records
Notes Size range — ISO 5167-2 covers bores from 50 mm to 1000 mm (5.3.1): larger runs and NPS 2″ Sch 80 and heavier (D < 50 mm) are built to AGA-3. Flange and D and D/2 tap holes on runs built to ISO 5167 are 4 – 12 mm by line size, inside its limit (5.2.2.7); with AGA-3 tap holes, NPS 2″, NPS 3″ Sch 160 and heavier and NPS 4″ Sch 80 and heavier fitting runs are built to AGA-3 (INK-DS-02).
Materials

Material selection

A custody transfer run is qualified as one package, so every pressure part is specified to the same minimum design temperature and rating.

SpoolsA106 Gr B carbon as standard; A333 Gr 6 for low temperatureA333 Gr 6, impact tested, where the minimum design temperature calls for it. Other grades on request.
FlangesA105N carbon as standard; A350 LF2 for low temperatureOn a low temperature run the flanges are matched to the spools, so no single joint sets a higher minimum temperature than the rest of the package.
Fitting bodyA216 WCB casting as standard; LCB-equivalent cast steel for low temperature service; other grades on requestMatched to the spools and flanges, so the fitting and the run are qualified together.
Plate, conditioner & internals316 / 316L stainless steel; conditioners also in coated carbon steelOrifice plate in stainless steel, never carbon steel: 316L as standard in fittings (INK-DS-02), 316 / 316L or 304 / 304L in flange unions (INK-DS-01); flow conditioner in 316 / 316L, or in galvanised, chrome-plated or nickel-plated carbon steel; straightening internals in 316 / 316L. The orifice plate and the 19-tube bundle are machined to the AGA-3 / ISO 5167 tolerances; perforated conditioner plates to the published geometry of their design.

Where it runs

Sectors this family is specified into most often.

Natural gas custody transfer Fiscal metering Refining Petrochemical Thermal power Gas turbine fuel
Ordering data

What to send for sizing

A meter run has no catalogue length. Upstream and downstream lengths come out of the beta ratio and the fittings ahead of the run, per AGA-3 and ISO 5167-2; where the available space is shorter than the standard demands, a conditioner is placed at the qualified distance and the run is built around it.

The general arrangement, with support spacing and centreline height, is issued for approval before fabrication starts.

Sizing enquiry sheet →
Process data What it decides
Line size, schedule and material Sets the spool bore and the material of the whole run
Flange standard, rating and facing Raised face or RTJ, and the end preparation if welded in
Element required in the run Flange union, single chamber or dual chamber fitting
Medium, flow range, pressure and temperature Sets β, the bore and the differential at each flow point
Overall length available Decides whether a conditioner is needed to meet the straight-run rule
Upstream fittings and layout Bends, valves and reducers each carry their own length requirement
Fiscal or custody transfer duty? Decides whether AGA-3 applies alongside ISO 5167
Witnessed inspection required? Sets the test and documentation scope, and the delivery time

Documents

PDF Custody transfer meter run datasheet EN · 4 pages → PDF White paper 04 — Proof, Not Paperwork EN · 7 pages · conditioner conformity in AGA 3 and ISO 5167 → PDF White paper 03 — Maintenance Without a Shutdown EN · 5 pages → XLS Meter run datasheet Space available, conditioning, ends →
Specification text For tender documents and instrument data sheets. Fill in the values in brackets; the text names no manufacturer.
  1. Meter run: [orifice plate / dual chamber fitting / single chamber fitting] meter run to AGA Report No. 3 / ISO 5167-1 and -2; line size [NPS …], rating [ASME Class …].
  2. Straight lengths: to AGA-3 / ISO 5167-2, or shortened with a [Zanker / NEL (Spearman) / Laws / tube bundle] flow conditioner at its qualified position.
  3. Tube bore: machined and recorded, four diameters measured in each cross-section; internal surface within the upper and lower roughness limits of the standard for the line size and β.
  4. End connections: flanged to ASME B16.5 / B16.47, [RF / RTJ]; or butt weld ends to ASME B16.25.
  5. Materials: [ … ], to suit the process and the line piping class.
  6. Marking: tag number, measured bore, flow direction and spool identification on each section.
  7. Fabrication, testing and documents: qualified welding procedures, NDE and hydrostatic test (pneumatic where specified) to the project specification; sizing calculation, bore measurement report, material certificates EN 10204 3.1 / 3.2, welding and NDE records.

Related products

Back to the catalogue →
Dual Chamber Fitting

Dual Chamber Fitting

Plate change under pressure

Single Chamber Fitting

Single Chamber Fitting

Top access, local outage

Flow Conditioners

Flow Conditioners

Shortens the upstream run

Small Bore Meter Run

Small Bore Meter Run

Below NPS 2″, ASME MFC-14M

Request a quote

Custody Transfer Meter Runs

Send the line size, the flow range and how much straight pipe you actually have. We come back with a run layout, the conditioning arrangement it needs and a price.

Prefer email? info@inkotekenerji.com
A P&ID, datasheet or specification, or for a replacement a nameplate photo — up to 5 files, 10 MB in total: PDF, Excel, Word, DWG, DXF, JPG or PNG. Larger files to info@inkotekenerji.com, quoting the reference we send you.